Question
Download Solution PDFLow cost, higher volume items requires:
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFExplanation:
Low cost, Higher volume items:
- Pre-production checks are performed before production begins and continue until 20% of the manufacturing is done.
- Quality control determines if a process is under control or not. It assesses process variability and discovers unique deviations in a process. It assures the product's quality.
- The three major goals of quality control in such a system are to improve product quality and decrease risks, increase production efficiency, and build customer loyalty.
- These three goals will be visible in every manufacturer with a strong and functioning quality control program.
- Low-cost, high-volume commodities require little examination, whereas high-cost, low-volume ones necessitate extensive scrutiny.
Last updated on Mar 4, 2025
-> OSSC Combined Technical Services Exam Mains (2023) Exam Date is out! The OSSC CTSRE Mains will be conducted on 15th March, 2025.
-> The OSSC CTSRE Prelims Answer Key for the 2023 cycle has been released for the Junior Engineer posts. The exam will be held on 9th June 2024. Candidates could raise objections online till 14th June 2024.
-> OSSC CTSRE 2024 Notification has been released.
-> A total of 381 vacancies have been announced under various Departments for the post of Junior Engineers & Junior Motor Vehicle Inspector.
-> Candidates can apply for the posts from 2nd April 2024 to 1st May 2024.
-> The examination will comprise 3 stages- Prelims, Mains, and Certificate Verification.
-> Prepare for the exam OSSC CTSRE Previous Year Papers.