Question
Download Solution PDFA alone can do a piece of work in 30 days. He worked at it for 5 days and then B alone finished the remaining work in 10 days. In how many days B alone can finish the entire work?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFGiven:
A's work rate = 1/30 (A can do the work in 30 days)
A worked for 5 days
B finished the remaining work in 10 days
Formula:
Work rate × Time = Work done (1 job)
Calculation:
Work done by A = (A's work rate) × (Time A worked) = (1/30) × 5 = 5/30 = 1/6
Now, the remaining work to be done when B takes over is 1 - 1/6 = 5/6.
Let "x" be the number of days B takes to complete the remaining work:
(B's work rate) × x = 5/6
(B's work rate) × 10 = 5/6 (B finishes the remaining work in 10 days)
Now, let's find B's work rate:
(B's work rate) × 10 = 5/6
(B's work rate) = (5/6) / 10 = 5/60 = 1/12
Now that we know B's work rate, we can find how many days B alone can finish the entire work:
(B's work rate) × Time = 1
(1/12) × Time = 1
Time = 12 days
So, B alone can finish the entire work in 12 days.
Last updated on Jul 10, 2025
-> SSC MTS Notification 2025 has been released by the Staff Selection Commission (SSC) on the official website on 26th June, 2025.
-> For SSC MTS Vacancy 2025, a total of 1075 Vacancies have been announced for the post of Havaldar in CBIC and CBN.
-> As per the SSC MTS Notification 2025, the last date to apply online is 24th July 2025 as per the SSC Exam Calendar 2025-26.
-> The selection of the candidates for the post of SSC MTS is based on Computer Based Examination.
-> Candidates with basic eligibility criteria of the 10th class were eligible to appear for the examination.
-> Candidates must attempt the SSC MTS Mock tests and SSC MTS Previous year papers for preparation.